CONDITION HOURS AND ATTACHMENT SUBJECT TO CHANGE, MACHINE LOCATED IN FLORIDA, BUYER TO PAY FOR FREIGHT, Online Owner's Manual , PLEASE CALL FOR MACHINE LOCATION, R BOOM-25'7", 13'7" STK, BKT, HQC, 35" DG HD PPR2, CWT W/REMOVAL, 1975 IDLE HOURS, 51% IDLE TIME
Yes : ✔ No : ✖ Good : ●●● Fair : ●● Poor : ●
GENERAL CONDITION
Machine Starts and is Operable
✔
S.O.S. (All Compartments)
✖
VIDS/VIMS Download Available
✖
Machine Starts and is Operable
✔
S.O.S. (All Compartments)
✖
VIDS/VIMS Download Available
✖
Machine Starts and is Operable
✔
S.O.S. (All Compartments)
✖
VIDS/VIMS Download Available
✖
GENERAL APPEARANCE
Cleaning Required
✖
Extra Fuel Tanks
✖
Cleaning Required
✖
Extra Fuel Tanks
✖
Cleaning Required
✖
Extra Fuel Tanks
✖
SAFETY ITEMS
ROPS
✔
Safety Decals In Place
✔
Safety Decals Legible
✔
ROPS
✔
Safety Decals In Place
✔
Safety Decals Legible
✔
ROPS
✔
Safety Decals In Place
✔
Safety Decals Legible
✔
OPERATOR STATION
Current O&MM
✖
Current Parts Manual
✖
Current O&MM
✖
Current Parts Manual
✖
Current O&MM
✖
Current Parts Manual
✖
ENGINE
Blow By
✖
Fuel Leaks
✖
Knocking
✖
Oil Leaks
✖
Water in Oil
✖
Blow By
✖
Fuel Leaks
✖
Knocking
✖
Oil Leaks
✖
Water in Oil
✖
Blow By
✖
Fuel Leaks
✖
Knocking
✖
Oil Leaks
✖
Water in Oil
✖
COOLING SYSTEM
Fan
●●●
Radiator
●●●
Fan
●●●
Radiator
●●●
Fan
●●●
Radiator
●●●
ELECTRICAL, STARTING AND CHARGING SYSTEM
Block Heater
✖
Ether Aid
✔
Block Heater
✖
Ether Aid
✔
Block Heater
✖
Ether Aid
✔
HYDRAULICS
Ether Aid
Stick and counterweight removed for transport testing was limited
Ether Aid
Stick and counterweight removed for transport testing was limited
Ether Aid
Stick and counterweight removed for transport testing was limited